For years you could see the East Bank riverfront from downtown but couldn't stand on it. Axios Nashville described that stretch of the Cumberland as historically sealed off to the public on the underdeveloped East Bank. On Sept. 4, 2026, Mayor Freddie O'Connell cut the ribbon on the River North Greenway, a 1,056-foot walkway along the water.
That's about a fifth of a mile. The full East Bank greenway is expected to run nearly two miles once it's finished. So what opened this fall is a short, finished piece of a riverfront that's still mostly plans. That shapes how the walk works today. You drive to it, park, walk it, and walk back. Every link that would turn it into a route through the East Bank runs on its own schedule, and none of those schedules is firm.
The Fifth of a Mile You Can Use Today
The finished segment is simple. Axios reported wide walking paths, plenty of places to sit along the river, and a downtown skyline view you can't get from any other angle. Oracle paid for the greenway.
At the opening, the mayor described the goal this way:
"Our shared vision is for a place that shows respect for the river and allows us to enjoy its beauty. We want public spaces that are welcoming for all with safe connections that unite with surrounding neighborhoods."
The first half of that is already true. The "safe connections" are the part still to come. Right now the path doesn't join any existing greenway. An August 2026 update to the East Bank Development Authority board lists a planned Phase 2 heading north to Cowan Street, a planned side connection to East Nashville, and more than 5,200 linear feet of greenway still to be added.
Until those pieces arrive, you can't jog over from East Nashville or bike in from Shelby Bottoms. The opened stretch is the first leg of a plan that will eventually link the Oracle campus to Shelby Bottoms Park, but it's only the first leg.
Parking Sets the Length of the Visit
Since you can't walk or bike in on a connected path yet, getting there means driving, and parking sets your time limit. Axios reported free parking for up to two hours in the lot next to the development. No published sources list hours for the greenway itself or a second entrance.
The entrance sits right next to the River North Shake Shack, and the Hoppin' River North beer bar is a short walk away. Both are listed at 2300 Bowline Avenue. Two hours is enough for one easy loop:
- Park in the free lot and start at the entrance by Shake Shack.
- Walk the 1,056 feet and back, stopping at the benches facing the skyline.
- End on the Hoppin' patio, which looks out over the same stretch of river you just walked.
Shake Shack lists hours of 10 a.m. to 11 p.m. Sunday through Thursday and 10 a.m. to midnight on Friday and Saturday, so an evening walk still has dinner waiting at the end.
The Taproom That Opened Before the Path
Hoppin' River North, at Suite 103, describes itself on its drink menu as 60 self-pour taps covering beer, wine, cocktails, cider, seltzer, nonalcoholic options and THC beverages, plus a full-service cocktail bar. The company's location page highlights a riverfront patio with views of the greenway and the river, and screens for watch parties. The food menu leans on flatbreads, including pepperoni, pesto chicken, buffalo chicken and pimento cheese. Dogs are welcome outside on the patio, according to the pet-travel directory BringFido.
Hoppin' and Shake Shack were open months before there was anything to walk. In April 2026 the Tennessean ran a story headlined Early businesses on Nashville's emerging East Bank navigate slow start. It opened with the taproom's owner looking out over the Cumberland at a mostly empty patio. That was five months before the ribbon-cutting. No published reporting yet shows whether the greenway has changed foot traffic. What has changed is that the patio now looks onto a public path where it used to look onto a closed riverbank.
A Business Cluster That Throws Its Own Parties
River North is more than two storefronts. On July 30, 2026, Oxbow and The Wayward hosted a free block party called An Evening in River North behind their building at 2135 Waterside Drive, according to Nashville Guru. It ran from 5 to 8 p.m., with live music from Michael Leatherman and a free giveaway.
The neighborhood businesses offering deals that night give a working list of what's around the greenway:
- Shake Shack
- Toxxology
- Clean Your Dirty Face
- Muse Paintbar
- Prickly Pear Coffee Co.
- BodyRok
- Sweet Truth Dental
So there's coffee, a paint-and-sip studio, a fitness studio and personal-care shops, all within the same few blocks as a river walk. Those businesses organized an event to bring people to the district a month before the greenway opened. No fall 2026 event at Hoppin' River North had been posted as of this writing.
Four Clocks, Running Separately
The walk gets longer and better connected only as each of these pieces opens, and none is tied to the others' schedules. The East Bank Development Authority's public materials have each one at a different stage.
| Piece | What it adds for someone on foot | Status in the latest EBDA material |
|---|---|---|
| River North Greenway, Phase 1 | 1,056 feet of riverside path | Open since Sept. 4, 2026 |
| River North Greenway, Phase 2 | Extends north to Cowan Street | Planned; no date published |
| Lateral connection | Ties the greenway to East Nashville | Planned; no date published |
| Oracle pedestrian bridge | Crosses the river to Germantown | In U.S. Army Corps of Engineers permitting, with preliminary Metro reviews underway; no start date |
| Seigenthaler Bridge Connector | Links the Seigenthaler Pedestrian Bridge to the existing greenway at Wasioto Park | Start listed as November 2026 in the August board packet and as Q2 2027 on the EBDA website |
The Germantown bridge matters most to people on the west side of the river. Until it's built, getting from Germantown to River North on foot means taking one of the existing crossings. The board packet describes the bridge only as being in federal permitting, with no construction start or opening date.
The Seigenthaler Bridge Connector is a separate project farther south. Nashville Post reported that the connector ramp will land the Seigenthaler Pedestrian Bridge near the planned Tennessee Performing Arts Center building and link it to the existing greenway at Wasioto Park, built for pedestrians, cyclists and people with disabilities. The August 25 board packet says construction is to begin in November. The authority's website schedule lists Q2 2027. Neither date has been officially confirmed as the final one, so this winter will tell.
What's Being Built Around the Path
The rest of River North is still under construction, and that shapes what you see from the benches. The EBDA packet says early construction on the Oracle campus began in the first quarter of 2026. The Tennessean reported that Oracle's final site plan went to Metro Planning in early September. It shows five clusters of office buildings and a hotel complex arranged around a water feature. The same EBDA presentation includes a concept rendering of a hotel at 611 Cowan Street. Street work is coming too. Metro and the state are partnering on a Marine Drive extension and Cowan Street improvements. TDOT has shortlisted Kiewit Infrastructure South Co., MasTec Civil and Shimmick Construction as design and construction teams, and the authority has committed up to $80 million to the work.
The greenway is also one of several new parks opening around Nashville at once. Earlier this summer, the city finalized a deal to acquire 300 acres to expand Beaman Park, and Mariposa Park in southeast Davidson County recently opened. According to the mayor's office, greenway projects in the pipeline include a link from Park Plaza to Centennial Park along Interstate 440, a connection from Sevier Park to Browns Creek Pike, and the Opry Mills connector. Of all of these, River North has the most unfinished work around it, so it's the one most likely to look different every few months.
For a fall afternoon, the plan is simple. Park in the free lot, walk the 1,056 feet, and sit on the Hoppin' patio while the cranes work across the way.
Businesses in River North opened before the foot traffic did, which is a bet that's common in emerging districts. Owners who make that bet, and buyers weighing a business in a district still being built, both have to price what's open today separately from what's only planned. If you're thinking about buying or selling a business in a Nashville district like this one, Meridian Business Advisors can help you value it and run a confidential process. Inquire to set up a private conversation.